Fa
According to the report of Public Relations and International Affairs of Petropars Group, the visit was conducted on Wendnesday, Decemver 8, 2021. Participants in the visit included Dr. Seyed Mohammad Mehdi Fatemi, Head of EPD-EPC Projects, Deputy Minister of Development and Engineering of the National Oil Company, and Engineer Ali Ahouchehr, Director of Iranian Offshore Engineering and Construction Company. They visited the manufacturing process of the equipment manufactured by Iranian specialists and emphasized on accelerated development of the maintenance project and increased production in this field. Forouzan Joint Oil Field is one of the oldest oil fields in Iran; in order to increase extraction capacity of the field, this project as an EPC-EPD contract, has been assigned to a consortium consisting of Petropars Limited (PPL) and Iran Shipbuilding and Offshore Industries complex (ISOICO) managed by Petropars.
Post a Comment
Name Is Required
Email Is Required Invalid Email Address
Comment Is Required
Notify me of followup comments via e-mail
All Comments
There are currently no comments. You can be the first to you comment.