Our Projects South Pars Phase 1 Subcontractors
|
|
| |
|
 |
|
|
|
SP1 Onshore Facilities Subcontractors
|
|
|
 |
IRAN
|
 |
MAPNA
|
Engineering, procurement and construction of the Utility project have been done by MAPNA. The Major Utility Facilities are as following:
-
Power Generation Unit
-
Steam Generation and Distribution
-
Seawater desalination for production of potable water, plant water and dematerialized water
-
Firewater storage and distribution
|
|

|
IOEC
|
Engineering, procurement and construction of Telecommunication system project have been done by IOEC. This system links offshore living quarters platform, Lavan Island and Assaluyeh by a triangular architecture envisage to maximize the system availability/reliability. The system will also be linked to NIOC network at Kangan Refinery.
|
|

|
Paysaz
|
Engineering, Procurement and Construction of Condensate Storage Tanks have been done by Paysaz. Four identical Product Storage Tank have a total nominal capacity of 1000000 barrel. The Tanks are of double deck floating roof type.
|
|

|
Abej
|
Engineering, Procurement and Construction of the Operating Base have been done by Abej. The Operating base consists of administration buildings, indoor and outdoor warehouse, workshop, vehicle maintenance center, petrol station, canteens, clinic fire station and etc.
|
 |
SOUTH KOREA- IRAN
|
 |
Daelim / IDRO Consortium |
Engineering, procurement and construction of the Process Plant project have been done by DIC. The major units in process plant are as following:
- Gas Sweetening
- Gas Dehydration
- Mercaptan Removal
- Gas Dewpointing
- Gas Compression
- Sulphur Recovery from acid gas
- Condensate Stabilization
- Waste Water Treatment
- Molten Sulphur solidification and forming as granular
|
|
|
|
 |
|