The harbor facilities consists of the following:
-
Small Boat Harbor for supply boats and tugs
-
Sulfur export jetty to load marine vessels of 15,000 tones DWT capacity
-
Seawater intake facilities as required by the refinery
-
Installation of the SBM and 30” submarine pipelines to load condensate products to marine tankers of 80,000 tones DWT capacity
-
Harbor infrastructure such as administration office, marine operations, cargo loading and unloading facilities and guardhouse
Single Buoy Mooring Facilities
40,000 barrels of stabilized condensates are produced daily from Phase 1 for export purposes. Condensates are delivered a distance of 3.8 Km from the refinery via 30” sub-sea pipelines to the loading facilities of the Single Buoy Mooring (SBM).
The SBM facilities are designed to support carrier vessels with loading capacities of 80,000 tons.
Other phases of the South Pars also plan to share these SBM facilities.