Home  Contact Us   Site Map   فارسی     Search >>
Our Projects South Pars Phase 1 Offshore Wellhead Platforms
 
  
SP1 Wellhead Platforms (SPD 1 & 2)

The SPD 1 & 2 Wellhead Platforms are supported by six legged jacket structures and are provided with sixteen well slots divided into two well bays of eight slots each.

Current plans are to drill six wells from each of these platforms.

Each well shall produce 1 billion standard cubic feet per day (MMSCFD). Each platform consists of a 3 level open module 16 by 27.5 meters.

SPD1 weighs 1000 tons and is connected to the production platform (SPP1) by a bridge.

The SPD2 platform weighs 1474 tons and is equipped with landing facilities for a helicopter and is located 5 Km from the SPD1 platform.

SPF 1&2 Jackets, Bridges & Flare

The flare tip is located 220 meter away from SPP1 and 40 meters above its upper deck.

The tripod flare tip support platform is linked to SPP1 by two bridges and one identical bridge support platform.

The bridge is 44-meters long and weights about 120-tons.

  
Copyright © 2010 PETROPARS Ltd. – ICT Dep. All rights reserved.