Our Projects South Pars Phase 1 Onshore Utility Facilities
|
|
| |
|
 |
|
|
|
The main areas of the Utility facilities consist of the following sections:
-
 4 Gas Turbine Generators (GTG) each with a capacity of 30 Mega Watts (MW)
-
3 Desalination Packages each with a rate of 85 cubic meters per hour (m3/h)
-
3 Gas Generators each at a rate of 80 tons of steam per hour
-
3 electrical Sea-Water-intake-pumps each at a rate of 2300 m3/h
-
2 diesel Sea-Water-intake-pumps each at a rate of 1000 m3/h
-
Industrial Water Treatment at a rate of 25 m3/h
-
Compound Free Water Treatment at a rate of 45 m3/h
-
Sweet Water Treatment at a rate of 78 m3/h
-
Nitrogen Generator and Booster

|
|
|
 |
|