Our Projects South Pars Phase 1 Onshore Utility Facilities
 
  
SP1 Utility Facilities

The main areas of the Utility facilities consist of the following sections:

  • Gas Turbo Generator (GTG) 4 Gas Turbine Generators (GTG) each with a capacity of 30 Mega Watts (MW)
  • 3 Desalination Packages each with a rate of 85 cubic meters per hour (m3/h)
  • 3 Gas Generators each at a rate of 80 tons of steam per hour
  • 3 electrical Sea-Water-intake-pumps each at a rate of 2300 m3/h
  • 2 diesel Sea-Water-intake-pumps each at a rate of 1000 m3/h
  • Industrial Water Treatment at a rate of 25 m3/h
  • Compound Free Water Treatment at a rate of 45 m3/h
  • Sweet Water Treatment at a rate of 78 m3/h
  • Nitrogen Generator and Booster

 

 

 