Our Projects South Pars Phases 4&5 Onshore
|
|
| |
|
 |
|
|
|
SP4&5 Onshore Information
|
|
|
The onshore section of the project consists of two main parts : Onshore Plant and 56² pipeline.
Onshore Plant :
The main processing units consist of the following:
-
Reception of the three-phase fluid from the 32" sea-line and separation of gas, condensate and water through the slug catcher.
-
Gas Treatment to meet the required specifications through the following procedure :
-
Sweetening through the MDEA unit.
-
Dehydration.
-
NGL & extraction in order to produce Methane.
-
Recompression Methane gas for domestic use.
-
NGL fractionation in order to produce Ethane as petrochemical feedstock.
-
NGL fractionation in order to produce Propane and Butane.
-
Treatment of Propane and Butane in order to remove mercaptans for export
-
Stabilization of condensate.
-
Separation and solidification of Sulfur for export.
-
MEG regeneration and pumping unit.
56² Pipeline
One 56² pipeline 75km long transports the dry and treated lean gas to IGAT3 tie-in manifold in the vicinity of Kangan Refinery for domestic use.
|
|
|
 |
|